Direct Flooring - London Road

Client: Clark Contracts Cost: Circa 30K Contract Duration: 6 weeks Asbestos Removal Asbestos removal works involved removing all asbestos roof sheets from existing yard shed to the rear of the site. All regulations were followed with all personnel utilising the adequate protection. Soft Strip & Mechanical Demolition After safely completing the asbestos removal we began the soft strip of the 1 storey sandstone and metal clad commercial warehouse. When complete, we proceeded with the mechanical demolition using our Doosan DX225 equipped with a 360 degree rotating grab. All material from the demolition, plasterboard, wood and metal, were all segregated and removed from site using 40-yard RoRo bins to remove them to the correct disposal depots. All INERT waste was brought back to BDL Demolition’s yard and crushed to 6F2 material for reuse. *** London Road demolition & asbestos removal was completed on time and within budget. We successfully recycled 98% of the material removed from site.